| Chapter # | | Chapter Title |
| 1 | | Choosing One System Over Another |
| | | |
| 2 | | Finish and Texture Options |
| | | |
| 3 | | Establishing Expectations with the Builder, Architect, and Owner |
| | | |
| 4 | | Budget Analysis |
| | | |
| 5 | | Writing a Fair Contract |
| | | |
| 6 | | The Importance of Safety |
| | | |
| 7 | | Site Conditions Affecting the Installation of Decorative Overlays |
| | | |
| 8 | | Dealing with Moisture-Vapor Transmission |
| | | |
| 9 | | Surface Preparation: Obtaining the Right Profile |
| | | |
| 10 | | Repairing Cracks |
| | | |
| 11 | | Estimating Materials |
| | | |
| 12 | | Following the Technical Data Sheets |
| | | |
| | | Photo Gallery |
| | | |
| 13 | | Setting Up a Mixing Station |
| | | |
| 14 | | Underlayments |
| | | |
| 15 | | Self-Leveling Overlays |
| | | |
| 16 | | Spray-Down Systems |
| | | |
| 17 | | Microtoppings |
| | | |
| 18 | | Stamped Overlays |
| | | |
| 19 | | Vertical Stamped Overlays |
| | | |
| 20 | | Adding Excitement with Color |
| | | |
| 21 | | Sealing and Protecting Your Work |
| | | |
| 22 | | Tools, Equipment, and Supplies |
| | | |
| 23 | | Tips for Marketing Decorative Overlays |
| | | |
| | | Glossary |
| | | |
| | | Resources |